Airports
  Retail
  Education & Religious
  Healthcare & Senior Living
  Hospitality & Resort
  Municipal & Governmental
   
  Specialty Services
 
Utility & Water
  • Rueter-Hess Dam and Reservoir
    GROUND Engineering provided quality assurance construction observation and materials testing services for the new construction of the Rueter-Hess Dam and Reservoir in Parker, Colorado. The Rueter-Hess Dam has 22,000 acre-feet of active water storage and is classified as a Large, Class I (High Hazard) dam based on its size and relative risk to population. The 7,700 LF long crest has a maximum height of 195 feet from the existing streambed and required approximately 12.5 million cubic yards of material placement. All laboratory testing was conducted at the on-site materials laboratory, provided by GROUND. Additional testing provided by GROUND includes ultrasonic and radiographic weld testing for steel piping.
  • Chimney Park Pipeline
    GROUND Engineering performed weld inspection and testing in support of the construction of approximately 2 miles of 60 inch steel water pipeline in Weld County, Colorado. GROUND provided Certified Weld Inspectors (CWI) to provide visual and Non-Destructive Testing (NDT) for each single welded lap joint in accordance with ANSI/AWS D.1.1. The interior single lap welds were evaluated utilizing dye penetrant testing (PT).
  • Clifton Water Treatment Plant
    The project consisted of the construction of a new wastewater treatment facility located in Clifton, CO with approximately 1.5 miles of a new sewer interceptor line to consolidate the three existing lagoon facilities within the planning area. The project also includes decommissioning of the existing lagoon systems owned by the two Districts as per regulatory requirements. GROUND provided materials testing services that included soil, concrete, masonry, drilled pier observation, reinforcing steel observations and asphalt testing. Soils testing at the projects included structural backfill material. Masonry testing included prism, mortar, and grout compressive strength tests, as well as reinforcing steel observations. Concrete testing included fresh concrete properties and compressive strength testing.
  • Eagle River Sanitation District Water Treatment Plant
    GROUND Engineering provided geotechnical recommendations for design and construction of the expansion of the Town of Eagle’s Waste Water Treatment Plant. The additional facilities included Headwork Building, Clarifier, Parshall Flume, UV Disinfectant Building, WAS Storage Tanks and Solids Handling Building with a total of 16,550 square feet for the expansion. The foundation systems are founded on varying thicknesses of structural fill placed above the existing sands and gravels.
  • Dry Creek Reservoir
    Located in Larimer County, Colorado, the construction of the new 9,000 acre-ft dam included over 890,000 CY of embankment fill, associated dam structures, over 7,500 LF of pipeline, a new pump station, and a 9,450 LF access road. An estimated total of 13,000 CY of roller compacted concrete was placed during construction of the new dam.
  • Three Lakes Waste Water Treatment Plant
    GROUND provided the geotechnical engineering and construction materials testing for the construction of the Three Lakes Waste Water Treatment Plant located in Grand County, Colorado. The construction included a regional wastewater collection and treatment facility consisting of a batch reactor plant, more than 20 miles of sewer main and 122 lift stations. The District furnishes sanitary sewer service to over 2,700 residential and 118 commercial properties.
     